|
references 
|
|
| Cartiere
Burgo S.p.A., Printing paper mill PM9, Verzuolo, Italy. Design of the
precast concrete frame structures of the paper mill, building volume 775 000 m3.
The production line is one of the largest LWC-paper lines in the world. |
| Drewsen Spezialpapiere GmbH
& Co. KG. Paper mill, Lachendorf, Germany. Design of the precast
concrete frame structures of the mill building, building volume appr. 100 000
m3. |
KNP Leykam AG, Fine paper mill, Gratkorn, Austria.
An industrial building constructed entirely of prefabricated concrete units, 732.000 m³. Finnish precast concrete know-how in Europe. All drawings delivered via Internet. |
| Metsä-Serla Paper and Board Ltd., Kiri-project, Fine paper mill, Kirkniemi, Finland.
Building volume 980.000 m³. Record-short implementation time by applying modern technology. Awarded by the Concrete Structure of the Year honourable mention. |
| Holmen Paper AB, Newsprint mill, Braviken, Sweden. An industrial building constructed entirely of prefabricated concrete units, 300.000 m³. Victory for the precast concrete contract due to the innovative design. |
| Myyrmanni Mall, Vantaa, Finland.
A large shopping centre in Finland. Completely precast concrete frame above ground level, 450.000 m³. Long spans (16.2 m), low intermediate floor structures, facades constructed of
polished, coloured concrete. |
| Hotel Holiday Inn, Helsinki, Finland. Completely precast concrete frame above ground level, 58.000m³. Very tight time schedule, part of the facades constructed of
polished, coloured
concrete. |
| . |
|
|